Flexible Interconnection: DERMS Solutions for Utilities

Increase Hosting Capacity Without Costly Grid Upgrades 

Unlock more capacity on your distribution network utilizing our flexible interconnection use case powered by MEPPI’s Strata Grid DERMS. Increase hosting capacity by 50–100%, accelerate DER interconnections, and defer millions in infrastructure investments—without waiting years for upgrades. 

Increase hosting capacity by 50–100% 
Reduce interconnection timelines by months or years 
Defer $Millions in grid upgrades 

Firm Hosting Capacity vs. Flexible Interconnections

The Grid Capacity Challenge Facing Utilities 

Demand for distributed energy resources (DERs) and large loads like data centers is rapidly exceeding available hosting capacity across distribution networks. As a result, utilities are facing: 

  • Growing interconnection queues 
  • Increased curtailment 
  • Project delays and cancellations 
  • Rising infrastructure costs 
  • Extending equipment lead times 

Traditional solutions rely on major grid upgrades that can take months or years to complete and require significant capital investment. Meanwhile, developers and large-load customers are left waiting, delaying critical energy and business initiatives. 

Flexible interconnection provides a smarter, faster solution. 

Download Whitepaper "Flexible Interconnections: A tool to reduce grid connection timelines and increase renewable penetration"